Heavy Snow Disrupts Munich Airport, Cancels 150 Flights in Bavaria

Ujjwal Sukhwani
By Ujjwal SukhwaniPublished Feb 21, 2026 at 08:26 PM UTC, 3 min read

Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience.

Heavy Snow Disrupts Munich Airport, Cancels 150 Flights in Bavaria

Heavy snow in Bavaria forced Munich Airport to cancel approximately 150 flights, causing widespread travel disruptions and dozens of traffic accidents.

Key Takeaways

  • Canceled approximately 150 flights over two days due to severe snowfall.
  • Mobilized a winter service fleet of 184 vehicles to clear 5.6 million square meters of surfaces.
  • Caused widespread regional disruption, including 75 snow-related traffic incidents.
  • Demonstrated the recurring challenge winter weather poses to major European air travel hubs.

Severe winter weather in the southern German state of Bavaria led to significant flight disruptions at Munich Airport (MUC), forcing the cancellation of approximately 150 flights over a two-day period. The heavy snowfall, which began on Thursday, February 19, also caused extensive ground transportation issues, with police reporting numerous traffic incidents across the region.

The disruption underscores the operational challenges that severe weather poses to major European air travel hubs. According to airport authorities, 100 flights were canceled on Thursday, followed by an additional 50 cancellations on Friday, February 20. The event created a ripple effect, impacting schedules across the continent as airlines adjusted to the conditions at one of Germany's busiest airports.

Airport's Winter Operations Response

Munich Airport, operated by Flughafen München GmbH (FMG), activated its extensive winter operational plan to combat the severe conditions. The airport's winter maintenance service is a large-scale operation designed to keep runways and taxiways clear and safe for aircraft movements. According to official airport data, the service maintains a dedicated fleet of 184 specialized vehicles, including snowplows, sweepers, and de-icing trucks.

The ground operation involves a significant workforce, with approximately 600 personnel on duty per season to manage snow and ice removal. This team is responsible for clearing a total surface area of 5.6 million square meters, encompassing the airport's two parallel runways, aprons, and extensive network of taxiways. The efficiency of this team is critical; it takes approximately 30 minutes to clear one of the airport's 4,000-meter-long runways, a key factor in minimizing operational downtime. Details of the airport's extensive preparations are outlined in its winter service plan.

Regional Impact and Broader Context

The impact of the weather extended well beyond the airport perimeter. Police in southern Upper Bavaria reported around 75 traffic incidents directly related to the snow and icy road conditions, highlighting the widespread disruption to regional travel. The coordination between airport operations and regional authorities, guided by forecasts from Germany's National Meteorological Service, the Deutscher Wetterdienst (DWD), is crucial during such events.

The situation at Munich Airport is representative of a recurring trend for major European hubs. Airports in Frankfurt, Amsterdam, and London have historically faced similar challenges, where disruptions at one key node can cause a significant cascading effect throughout the European air travel network. These events test the resilience of both airport infrastructure and airline contingency planning. Large airports like MUC rely on pre-planned strategies that often involve augmenting their staff with local agricultural and haulage contractors to ensure rapid clearing of critical surfaces.

By Friday afternoon, airport officials indicated that operations were largely returning to normal. No further significant disruptions were expected over the weekend as the weather system passed. The swift recovery demonstrates the effectiveness of the airport's investment in its winter service capabilities.

Why This Matters

This event highlights the vulnerability of major air travel hubs to severe weather and the critical importance of extensive, well-rehearsed winter operational plans. For airlines and passengers, such disruptions underscore the potential for network-wide delays originating from a single airport. The successful and rapid restoration of services at Munich Airport serves as a case study in effective contingency planning and resource mobilization for aviation professionals managing complex airport environments.

Stay ahead of the airline industry with commercial aviation news from flying.flights. Discover how innovation is shaping aviation through aircraft systems, avionics, and digital tools at flying.flights/technology.

Ujjwal Sukhwani

Written by Ujjwal Sukhwani

Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience. Covers flight operations, safety regulations, and market trends with expert analysis.

Visit Profile

You Might Also Like

Discover more aviation news based on similar topics

Fire at Cape Town Airport Temporarily Halts International Flights
airports
Feb 25, 2026 at 07:26 PM UTC4 min read

Fire at Cape Town Airport Temporarily Halts International Flights

A fire at Cape Town International Airport prompted a temporary suspension of international departures after impacting critical IT and network services.

Gatwick Airport Adds 12 New International Routes for Summer 2026
airports
Feb 25, 2026 at 07:26 PM UTC4 min read

Gatwick Airport Adds 12 New International Routes for Summer 2026

London Gatwick Airport is launching 12 new international routes with 8 new airlines for summer 2026, marking its largest network expansion since 2019.

Kenya Unveils $2B Master Plan for New Nairobi JKIA Terminal by 2029
airports
Feb 25, 2026 at 07:10 AM UTC4 min read

Kenya Unveils $2B Master Plan for New Nairobi JKIA Terminal by 2029

Kenya has unveiled a $2B plan for a new terminal and runway at Nairobi's JKIA to nearly double capacity to 15 million passengers annually by 2029.

Misima Airstrip K2.6m Runway Rehabilitation to Begin in March
airports
Feb 25, 2026 at 07:10 AM UTC4 min read

Misima Airstrip K2.6m Runway Rehabilitation to Begin in March

Papua New Guinea's Rural Airstrips Agency will begin K2.6m runway work at Misima Airstrip in March, restoring vital air service after a six-year closure.

India Approves ₹1,677 Crore Expansion for Srinagar International Airport
airports
Feb 25, 2026 at 03:19 AM UTC3 min read

India Approves ₹1,677 Crore Expansion for Srinagar International Airport

India's CCEA has approved a Rs. 1,677 crore expansion for Srinagar International Airport, aiming to boost annual capacity to 10 million passengers.

Melbourne Airport Begins Major International Terminal Expansion
airports
Feb 25, 2026 at 03:19 AM UTC2 min read

Melbourne Airport Begins Major International Terminal Expansion

Melbourne Airport is launching a major international terminal expansion to add five new aircraft stands and accommodate record passenger growth.