Pantnagar Airport's 3,000m Runway Will Unlock Major Boeing and Airbus Operations
Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience.
Pantnagar Airport is set for a major expansion, including a new 3,000m runway and a Rs 387 crore terminal, to boost Kumaon's air connectivity and cargo capacity.
Key Takeaways
- •3,000-meter runway extension will replace the current 1,340m strip, enabling Code 4C aircraft like Boeing and Airbus models to operate.
- •New terminal building, estimated at Rs 387 crore, is designed to handle over one million passengers annually and 475 passengers at a time.
- •Apron capacity will increase from two to five aircraft bays, allowing for a substantial rise in flight operations and regional connectivity.
- •The project introduces cargo services to the region for the first time, supporting tourism and industrial growth in Kumaon and the Terai region.
The Airports Authority of India (AAI) is driving a significant upgrade at Pantnagar Airport (PGH) in Uttarakhand. This expansion aims to transform the facility into a major aviation hub. The project is focused on enhancing air connectivity for the entire Kumaon region.
This development will allow much larger aircraft to operate from Pantnagar. The ultimate goal is to upgrade the airport to international standards.
Airside Infrastructure Overhaul
The most critical part of the project is the runway extension. The existing runway, currently around 1,340 meters long, will be replaced.
Key Airside Details
- Runway Length: The new runway will measure 3,000 meters long and 45 meters wide.
- Aircraft Capability: This length will allow operations for larger passenger aircraft. These include Boeing and Airbus models.
- Apron Capacity: The apron will expand to accommodate five aircraft simultaneously. This is a significant increase from the current two-aircraft capacity.
- Technical Goal: The runway extension is designed to cater to Code 4C type aircraft.
This airside work also includes strengthening the runway and taxiways. It also involves new isolation bays and perimeter roads.
New Terminal and Passenger Capacity
The first phase of the expansion includes a new terminal building. This facility is estimated to cost Rs 387 crore.
The new terminal will cover 8,500 square meters. It is designed to handle 475 passengers at peak hours. Annually, the terminal capacity will exceed one million passengers.
Modern passenger amenities are planned for the new facility. These include two aerobridges, escalators, and automated parking.
Economic and Regional Impact
The upgrade is poised to significantly benefit the economy of Uttarakhand. Improved air access will support tourism in the hill districts. Key areas include Nainital, Almora, and Pithoragarh.
Industrial and Cargo Opportunities
The expansion will also boost industrial units in the Terai region, including SIDCUL.
- New Cargo Services: Pantnagar Airport will introduce dedicated cargo services. This is a first for the region.
- Logistics Benefit: This will facilitate faster transport of agricultural goods and industrial products.
To make way for the new infrastructure, the project requires land acquisition and highway realignment. The Uttarakhand State Government transferred over 524 acres to the AAI.
Furthermore, a 7-kilometer section of the National Highway (NH-109/NH-74) must be relocated. This is necessary to accommodate the expanded airport boundaries.
The Airports Authority of India is overseeing the detailed design and construction. The overall development includes cityside and airside works. This will ensure a complete transformation of the aviation facility.
Get breaking commercial aviation news and expert airline analysis at flying.flights. Track policy changes, airspace rules, and global aviation governance in the Regulatory category at flying.flights/regulatory.

Written by Ujjwal Sukhwani
Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience. Covers flight operations, safety regulations, and market trends with expert analysis.
Visit ProfileYou Might Also Like
Discover more aviation news based on similar topics
Gatwick Airport Adds 12 New International Routes for Summer 2026
London Gatwick Airport is launching 12 new international routes with 8 new airlines for summer 2026, marking its largest network expansion since 2019.
Kenya Unveils $2B Master Plan for New Nairobi JKIA Terminal by 2029
Kenya has unveiled a $2B plan for a new terminal and runway at Nairobi's JKIA to nearly double capacity to 15 million passengers annually by 2029.
Misima Airstrip K2.6m Runway Rehabilitation to Begin in March
Papua New Guinea's Rural Airstrips Agency will begin K2.6m runway work at Misima Airstrip in March, restoring vital air service after a six-year closure.
India Approves ₹1,677 Crore Expansion for Srinagar International Airport
India's CCEA has approved a Rs. 1,677 crore expansion for Srinagar International Airport, aiming to boost annual capacity to 10 million passengers.
Melbourne Airport Begins Major International Terminal Expansion
Melbourne Airport is launching a major international terminal expansion to add five new aircraft stands and accommodate record passenger growth.
Lagos Airport Fire Forces Rerouting, Prompts Temporary ATC Tower Deployment
Nigeria's government rerouted airlines and deployed mobile ATC towers after a fire damaged Lagos' Murtala Muhammed International Airport on Monday.