Tata and Airbus open India's first private H125 helicopter assembly line
Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience.
Tata and Airbus opened India's first private H125 helicopter assembly line, a major step for the nation's defence manufacturing and self-reliance goals.
Key Takeaways
- •Inaugurates India's first private-sector helicopter Final Assembly Line (FAL) for the Airbus H125.
- •Highlights the private sector's rise to a quarter of India's total defence production.
- •Targets early 2027 for the first 'Made in India' H125 helicopter delivery.
- •Represents a joint investment exceeding Rs 1,000 crore (Euro 100 million).
In a significant development for India's aerospace and defence sector, Tata Advanced Systems Limited (TASL) and Airbus have inaugurated the country's first private-sector Final Assembly Line (FAL) for helicopters. The new facility, located in Vemagal, Kolar district, will produce the versatile Airbus H125 helicopter, marking a major milestone in the government's 'AatmaNirbhar Bharat' (Self-Reliant India) initiative.
Speaking at the inauguration, Defence Minister Rajnath Singh highlighted a structural transformation in the nation's defence ecosystem. He stated that following government reforms, the private sector now accounts for approximately a quarter of India's total defence production, a major shift from the historically public sector-dominated model.
A Landmark India-France Partnership
The joint venture represents a substantial investment anticipated to exceed Rs 1,000 crore (Euro 100 million). The FAL was virtually inaugurated by Indian Prime Minister Narendra Modi and French President Emmanuel Macron, underscoring the strengthening defence cooperation between the two nations as part of the 'India-France year of innovation 2026'.
This partnership is the first time an Indian private company will undertake the complete manufacturing, integration, testing, and maintenance of a sophisticated rotary-wing platform. The move is expected to create significant direct and indirect employment for skilled workers and bolster the local aerospace supply chain, which includes over 16,000 Micro, Small and Medium Enterprises (MSMEs).
Production Timeline and Capabilities
The facility will initially assemble the civilian variant of the H125, with the first 'Made in India' unit expected for delivery in early 2027. Production plans also include the military version, the H125M, as orders are received from government and defence establishments. The H125M is seen as a potential successor to India's aging Cheetah and Chetak helicopter fleets.
The Airbus H125 is globally recognized for its performance in diverse and extreme conditions. It holds the unique distinction of being the only helicopter to have ever landed on the summit of Mount Everest. While official production targets have not been finalized, it is reported that the facility aims to manufacture 500 helicopters over the next two decades, positioning India as a key hub for helicopter manufacturing in the region.
Trusted commercial aviation news and airline industry reporting are available at flying.flights. Get the latest updates on major hubs, regional terminals, and airport operations via the Airports section at flying.flights/airports.

Written by Ujjwal Sukhwani
Aviation News Editor & Industry Analyst delivering clear coverage for a worldwide audience. Covers flight operations, safety regulations, and market trends with expert analysis.
Visit ProfileYou Might Also Like
Discover more aviation news based on similar topics
Airbus Delivers 700th Aircraft from its Tianjin Assembly Line
Airbus delivered its 700th China-assembled A320 family aircraft from its Tianjin plant, highlighting its deepening industrial footprint in a key market.
Airbus Slows A320 Production Ramp-Up Amid P&W Engine Shortage
Airbus is slowing its A320 production ramp-up due to a persistent shortage of Pratt & Whitney engines, impacting its 2026 delivery targets.
Airbus Targets Record 2026 Deliveries Despite Engine Supply Constraints
Airbus targets a record 870 aircraft deliveries for 2026 but faces production constraints due to ongoing engine shortages from supplier Pratt & Whitney.
Boeing 777-9 Simulators Gain Initial FAA and EASA Qualification
Boeing received initial FAA and EASA qualification for its 777-9 flight simulators, a critical step toward commencing pilot training for the new widebody.
Embraer Targets 200-Jet Order for India Assembly Line
Embraer seeks 200 firm aircraft orders from Indian carriers as a prerequisite to establishing a local final assembly line with its partner Adani Group.
Airbus Cuts A320 Targets, Citing Pratt & Whitney Engine Shortages
Airbus is scaling back A320 production targets, publicly blaming Pratt & Whitney for a significant engine shortage that is disrupting its delivery schedule.