Why Gusau International Airport is Building a Security Trench Boundary
Key Points
- 1Zamfara State commenced construction of a security trench boundary at Gusau International Airport to enhance perimeter security.
- 2The security measures are designed to ensure strict compliance with national and international aviation safety standards, including ICAO requirements.
- 3The Gusau International Airport project, flagged off in June 2024, is a flagship initiative aimed at boosting economic activity and improving connectivity by around March 2026.
The Zamfara State Government has started building a security trench boundary at the ongoing Gusau International Airport project. This move is part of a larger plan to strengthen security around the new facility. The project site was formally handed over to the contractor by the Ministry of Works and Infrastructure. This action was done in collaboration with the Zamfara Geographic Information System (ZAGIS) and security agencies.
Compliance with Global Standards
The security trench boundary will act as a critical physical barrier. It is designed to ensure the safety of passengers and airport operations. Officials stated this exercise shows a commitment to providing strong security infrastructure. It also ensures compliance with national and international aviation safety standards. International Civil Aviation Organization (ICAO) regulations often mandate robust perimeter security. This includes both security fences and perimeter works to prevent unauthorized access. The designated boundary area will include the trench, airport perimeter fencing, and other protective measures. These steps are necessary for the safe and efficient operation of the airport.
Project Scope and Collaboration
The construction of the Gusau International Airport was officially launched in June 2024. It is a flagship project of Governor Dauda Lawal’s administration. The overall project is expected to be completed within 30 months. The new facility is intended to be a smart airport for both domestic and international flights. It will feature a 3.4-kilometer runway capable of accommodating large commercial aircraft, such as the Airbus A320 or Boeing 737 models.
Collaboration among various ministries and security operatives was highlighted during the handover. Engr. Amiru Musa Anka, leading the Ministry of Works delegation, emphasized this joint effort. Representatives from ZAGIS confirmed that all land verification and boundary delineation were complete. This guarantees a smooth and dispute-free execution of the project. Security agencies have pledged to work closely with the contractor. This will ensure the immediate start of the required security trench boundary arrangements.
Boosting Economic Activities
The airport is a key part of the state's strategy for growth. It aims at boosting Zamfara economic activities, improving connectivity, and attracting investment. The Governor has stated the airport will help overcome security challenges by offering safer air travel. This alternative is crucial given the long and often perilous road journey from cities like Abuja. The new airport is expected to replace the current Gusau Airstrip. This will significantly enhance air travel access to and from Zamfara State. For more commercial aviation news and updates, visit flying.flights.
- The committee visited the local community leader, Alhaji Rashi.
- The community assured full support for the successful project execution.
- Compensation issues for the host community will be handled transparently.
Topics
You Might Also Like
Discover more aviation news based on similar topics
Nigeria's Tax Overhaul: How Removing the 10% Aircraft Lease Tax Will Boost Airlines.
Nigeria's Presidential Fiscal Policy and Tax Reforms Committee has removed the 10% withholding tax on aircraft leases, a non-recoverable levy described as the single biggest financial burden on Nigerian airline operating margins.
Security Gaps at MMIA Could Jeopardize Nigeria's Global Aviation Standing
A former MMIA Commandant warns that Nigeria's aviation security failures, highlighted by a low ICAO audit score and poor infrastructure, risk international sanctions and safety downgrades.

Riyadh's KSIA Begins Construction on Third 4,200m Runway for Major Capacity Boost
King Salman International Airport (KSIA) began building a third 4,200m runway, aiming to boost operational capacity to 85 aircraft movements per hour.

FAA Taps RTX, Indra to Replace 612 Aging Radars: Will Air Travel Improve?
The FAA awarded contracts to RTX and Indra to replace 612 aging radar systems by June 2028, a major step in the US air traffic control modernization.
Family Sues Salt Lake City Airport Over Fatal Delta Jet Engine Security Failure
Delta jet engine victim's family sues Salt Lake City Airport for negligence, alleging security failures and poor emergency response allowed Kyler Efinger to access the tarmac and
NAMA: How Nigeria Manages Harmattan Flight Safety with Robust Navigational Aids
Nigerian Airspace Management Agency (NAMA) reassures air travelers that Harmattan weather does not compromise air safety, citing robust, ICAO-compliant navigational aids maintenance
Never Miss Critical Aviation Updates
Get the top aviation stories delivered to your inbox every morning